Availability: | |
---|---|
Quantity: | |
The fire-resistance glazing spring door is a kind of new-style fire resistant door, which not only solves the problem that the ordinary spring door can’t be used as the fire resistant door, but also solves the problems that the ordinary fire resistant door can't be made into the spring door.
Property of the door:
1.exclusive.
2.fire resistant, smoke prevention, insulation.
3.apply code lock, easy management.
4.It can be equipped with automatic starting system and control center linkage.
5.Patents, the most reliable.
6.Passing the British Standard BS476
Purpose: To create a more secure social production and Green living environment.
Technical feature:
Fire resistant rating: Grade I is 90 minutes, Grade II is 60 minutes
Sound insulation: Depending on the performance of fire resistant glass Used.
Heat insulation: Depending on the performance of fire resistant glass Used.
Fire rating: in case of outdoor, door frame should used in conjunction with fire-resistant glass
Products Introduction of Our Steel Door:
Material | Fire Rated Glass Door, Fireproof Steel Glass Door |
Standard dimension | 980*2100mm/ customized |
The thickness of the door leaf | 42mm/50mm/60mm |
Leaf: | 0.6/0.8/1.0mm thick galvanized steel |
Frame | 1.0/1.2/1.5mm thick galvanized steel |
Infilling | Perlite board |
Color | Powder coating/heat transfer-print |
Lock | Fireproof lock |
Hinges | 3-4PCS 5'' galvanized hinges |
Door closer | Auto close door closer |
Install bolt | 4-6 PCS/set |
Packing | EPE film+ foam board+ strong carton |
Application | Apartment, hospital, school and so on |
To custom the doors meet your market demands, we can make the designs and colors according to your requirements.
Normally, we have:
1. Door leaf thickness42mm/50mm/60mm(fire-rate>30mints, >60minutes, >120minutes)
2. Door frame thickness: 80mm-300mm available.
3. Size available: 2100*980mm*50mmas standard size, also can be as per requirement (height*width*thickness)
4. Accessories: Hinges, locks, door closer
5. Opening direction: Left or right, Inside or Outside
6. Opening degree: 90 degrees, 180 degrees.
But if you have special demands on above, we can also make for you.
Drawing Reference:
Our service:
Before Sale Service:
1.Sample provided; 2.Welcome visiting factory; 3.Timely reply; 4.Professional sales team.
Production period service:
1.Professional customization; 2.Timely progress update; 3.Strict quality inspection; 4.Delivery on time.
After sale service:
Regular follow-up; 2.Installation guide provided; 3.Solve the after-sales problem in time.
FAQ:
Q1: How can you guarantee your final quality?
A1: As for quality control, we've approved four testing procedures: Initial inspection, re-inspection,
final inspection and sampling inspection. Each step will take photos and save for u all the time,
also support free warranty service.
Q2: How long is the production lead time?
A2: It depend on your quatity, normally is 30 days after deposit.
Q3: What kind of Certification did you pass?
A3: After relevant institution of professional evaluation, we're qualified for BS,GB,AS
ISO9001, etc. Also can supply local test report according to customer's
requirement when necessary.
Q4: How is the MOQ of required?
A4: We welcome any quantity under your requested. but a competitive price is always
depends on the quantity increase gradually.
The fire-resistance glazing spring door is a kind of new-style fire resistant door, which not only solves the problem that the ordinary spring door can’t be used as the fire resistant door, but also solves the problems that the ordinary fire resistant door can't be made into the spring door.
Property of the door:
1.exclusive.
2.fire resistant, smoke prevention, insulation.
3.apply code lock, easy management.
4.It can be equipped with automatic starting system and control center linkage.
5.Patents, the most reliable.
6.Passing the British Standard BS476
Purpose: To create a more secure social production and Green living environment.
Technical feature:
Fire resistant rating: Grade I is 90 minutes, Grade II is 60 minutes
Sound insulation: Depending on the performance of fire resistant glass Used.
Heat insulation: Depending on the performance of fire resistant glass Used.
Fire rating: in case of outdoor, door frame should used in conjunction with fire-resistant glass
Products Introduction of Our Steel Door:
Material | Fire Rated Glass Door, Fireproof Steel Glass Door |
Standard dimension | 980*2100mm/ customized |
The thickness of the door leaf | 42mm/50mm/60mm |
Leaf: | 0.6/0.8/1.0mm thick galvanized steel |
Frame | 1.0/1.2/1.5mm thick galvanized steel |
Infilling | Perlite board |
Color | Powder coating/heat transfer-print |
Lock | Fireproof lock |
Hinges | 3-4PCS 5'' galvanized hinges |
Door closer | Auto close door closer |
Install bolt | 4-6 PCS/set |
Packing | EPE film+ foam board+ strong carton |
Application | Apartment, hospital, school and so on |
To custom the doors meet your market demands, we can make the designs and colors according to your requirements.
Normally, we have:
1. Door leaf thickness42mm/50mm/60mm(fire-rate>30mints, >60minutes, >120minutes)
2. Door frame thickness: 80mm-300mm available.
3. Size available: 2100*980mm*50mmas standard size, also can be as per requirement (height*width*thickness)
4. Accessories: Hinges, locks, door closer
5. Opening direction: Left or right, Inside or Outside
6. Opening degree: 90 degrees, 180 degrees.
But if you have special demands on above, we can also make for you.
Drawing Reference:
Our service:
Before Sale Service:
1.Sample provided; 2.Welcome visiting factory; 3.Timely reply; 4.Professional sales team.
Production period service:
1.Professional customization; 2.Timely progress update; 3.Strict quality inspection; 4.Delivery on time.
After sale service:
Regular follow-up; 2.Installation guide provided; 3.Solve the after-sales problem in time.
FAQ:
Q1: How can you guarantee your final quality?
A1: As for quality control, we've approved four testing procedures: Initial inspection, re-inspection,
final inspection and sampling inspection. Each step will take photos and save for u all the time,
also support free warranty service.
Q2: How long is the production lead time?
A2: It depend on your quatity, normally is 30 days after deposit.
Q3: What kind of Certification did you pass?
A3: After relevant institution of professional evaluation, we're qualified for BS,GB,AS
ISO9001, etc. Also can supply local test report according to customer's
requirement when necessary.
Q4: How is the MOQ of required?
A4: We welcome any quantity under your requested. but a competitive price is always
depends on the quantity increase gradually.
| NO 1506, XINYE ROAD, SHAPING TOWN, HESHAN CITY, JIANGMEN, GUANGDONG, CHINA |
| +8613750315014 |
|